Scannell Properties and Royal London Asset Management Property have awarded a contract to McLaren 色猫直播 to build TN2 Gateway, their joint development of warehouse and industrial facilities at Tunbridge Wells.
The scheme will deliver around 505,000 sq ft of warehousing accommodation with ancillary office space on a 33-acre site.聽 Six flexible buildings can be configured as up to nine units, ranging from 23,000 to 175,000 sq ft.
The post-development gross development value (GDV) is estimated at 拢135m.
The scheme is targeting BREEAM Outstanding and an EPC A+ rating. Plans include photovoltaic panels on all buildings, green roofs, carbon-neutral heating systems, energy efficient lighting and electric vehicle charging.

McLaren is contributing to sustainability by using hydrotreated vegetable oil (HVO) instead of regular DERV, along with ground granulated blast-furnace slag (GGBS) cement, structural and reinforcement steel from electric arc furnaces and low carbon pre-cast concrete planks for office structures and retaining walls.
McLaren 色猫直播鈥檚 managing director for industrial and logistics, David Gavin, said: 鈥淭his will be a stunning setting for an industrial park, with a generous planting scheme that blends sympathetically with the surrounding area. Creating the on-site part of that landscape is one of the most complex parts of the project. It鈥檚 more important than ever to draw on our environmental management experts to minimise the impact of construction.鈥
McLaren鈥檚 subcontractor team includes:
- Steelwork: B&K Structures
- Wall and roof cladding: CA Group
- Whitewall: Cold Clad
- Pre-cast warehouses: Modular Cubed
- CMC piling: Keller
- Curtain walling/glazing: Ridgeway Facades
- Photovoltaics: Watt Energy
- Passenger lifts: Kone
- Siphonic drainage: Sapaflow
- M&E: UME
- Dock levellers and doors: Promstahl
The first buildings are due to be ready for occupation in 2026.
Got a story? Email news@theconstructionindex.co.uk